Jump to content

Search the Community

Showing results for tags 'hyper form'.



More search options

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Forums

  • Altair Support Forum
    • Welcome to Altair Support Forum
    • Installation and Licensing
    • Modeling & Visualisation
    • Solvers & Optimization
    • Multi Body Simulation
    • Conceptual design and Industrial design
    • Model-Based Development
    • Manufacturing Simulation
    • CAE Process Automation
  • Academic Partner Alliance Forum
    • APA - Composites
    • APA - CFD & Thermal
    • APA - Vehicle Dynamics
    • APA - Manufacturing
    • APA - Crash and Safety
    • APA - Noise, Vibration and Harshness
    • APA - System Level Design
    • APA - Structural and Fatigue
    • APA - Marine
    • APA - Optical Design
  • Japanユーザーフォーラム
    • ユーザーフォーラムへようこそ
    • Altair製品の意外な活用例
    • インストールとライセンス
    • モデリング(プリプロセッシング)
    • シミュレーション技術(ソルバー)
    • データ可視化(ポストプロセッシング)
    • モデルベース開発
    • コンセプト設計と工業デザイン
    • 製造シミュレーション
    • CAE プロセスの自動化
    • 学生向け無償版
    • エンタープライズソリューション

Categories

There are no results to display.


Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Interests


Organization

Found 1 result

  1. Hello, While calculating the actual draw tonnage for the setup given in (ref.) IMAGE 1 ( O.K. in FLD & %Thinning), I have following doubts in calculation of the tonnage calculation in HyperGraph as: 1. In forming setup the binder force is 15T is used, but in the hypergraph it is showing more that 20T , so which should be consider as actual or required binder force to freeze the model setup? 2. How to calculate the actual Draw tonnage from the die(upper steel) & blank contact graph as shown in the IMAGE 2, i.e. which of the following point should select to define the required draw tonnage from die(upper steel) & blank contact curve (Ref. IMAGE 2)= A. At the End point i.e. complete bottoming stage? or B. At the Point where maximum tonnage is showing in the graph for the die(upper steel) & blank contact curve?
×
×
  • Create New...