Jump to content
Sign in to follow this  
DrewBilbao

Ply Card Edit apply coordinate system

Recommended Posts

Hello,

 

I am quite beginner in Hyperworks and I am currently modelling a laminate (HC panel) with different plies. Whenever I make a modification in the mesh, before running the calculation I need to re-open Ply card and specify elements that are included in each ply, because they are lost due to mesh (thus, element) modification.

 

I am wondering if there is another way to specify plies, because it might be relatively annoying to update this part of the model each time a mesh modification is carried out; in this case, number of plies is not extrenely big, but it can happen that a model consists of many of them, leading to a high waste of time.  For example, that instead of selecting elements which would be involved in a ply, surfaces could be selected. Any help would be helpful. 

 

Thanks in advance.

Regards

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
You are posting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...