Hi all,

I think the time step should be larger than the value setting in the /DT/NODA/CST. However, in my test, I found the time step sometimes smaller than this value. Why this happen? 

 

What's more, my case terminate with an error when using mass scaling. The case terminates normally without using keyword /DT/NODA/CST. What's the problem?

 

I have uploaded my engine file and out file.

 

2017-11-22_200225.thumb.png.a3854c1e2bf5649e8dd96a581cd11146.png

 

/DT/NODA/CST
0.67  0.8E-4

 

Roy

NewFoam5_1115_Old_FaceDrop_0001.rad

NewFoam5_1115_Old_FaceDrop_0001.out

Share this post


Link to post
Share on other sites
Guest

Hi Roy,

With the /DT/NODA/CST we are trying to impose a time step to the run. But during the run due to interfaces or nodes..etc the time step may even go down and the solver will add more mass to the system thereby it will be try to be back to the imposed value.

In your model the issue is with the interface id 62. Please check the same for any penetrations also.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
You are posting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...