Jump to content
JLB

Running Virtual Wind Tunnel sims in series

Recommended Posts

Hello,

 

I am trying to run many VWT sims on a geometry with small variances between each sim (for optimisation purposes), and would like to know if there is a queue option to only run a single sim at once (but still have these queued up). At the moment the default seems to be running these jobs simultaneously, which is causing memory issues. 

 

Is there a way to change the queue options to run one at a time?

 

Thanks!

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
You are posting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...