Jump to content
Minoru Yubuchi

Searching x value (time) from y value (result)

Recommended Posts

Dear Experts,

 

Please let me know how I can find a time when a result reaches a target in Activate. For example, in the simple model attached (sample.acm), the result reaches 70.0 at around 10.0 sec. I want to know the 10.0 from the 70.0, and to display it using Display block within diagram.

 

I built a model for it (sample_mod.acm) but it looks redundant. Are there any smarter way?

 

Thanks,

Minoru Yubuchi

Sample.scm Sample_mod.scm

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
You are posting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...