Jump to content
mpvnaresh

TIC DOF is SPC'ed for GRID ID 6107119 component 1

Recommended Posts

Hi 

 When i am running  a Direct Transient Solution,  with Initial Velocity  

 

The node  with ID   6107119   is Constrained by   1. SPC in DOF 1 =0

                                                                                      2.SPCD in  DOF 1 is 1.0

                                                                                    3. TIC (v) in DOF 1 is -2825.

 

Then i got the following errior

TIC DOF is SPC'ed for GRID ID 6107119 component 1

i did the same( SPC , SPCD TIC(v) for the same node in the same DOF) for number of practice models . But this is the first time i am getting this error . any body please  help me. 

 

 

Share this post


Link to post
Share on other sites

It does not make sense to impose SPCD and TIC on the same DOF.

Can you start the time earlier so that at some point with the imposed acceleration the velocity is X (you defined)?

Share this post


Link to post
Share on other sites

sir 

 

i just removed the load location rigids and re created and applied all the Boundary Conditions including Initial Velocity .

The problem is solving.

 

Thanks for the response. 

 

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
You are posting as a guest. If you have an account, please sign in.
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...